Location : |
Wimbledon |
Project Length : |
1 Week |
Project Type : |
Domestic |
Supply and fit of new unvented hot water system and mains water accumulator system to provide high pressure showers to existing bathrooms. Hot water and pressure were a big problem for the client so we designed this system to keep up with the busy households needs.
- Boosted cold water
- Unvented hot water
- High pressure showers